top of page

Taraz Water Treatment Plant (WWTP) Modernization

Project Description:

The project involves the design and construction of a modern wastewater treatment plant in Taraz, Kazakhstan, with a treatment capacity of 80,000 m³ per day. The initiative aims to replace outdated filtration lagoons, thereby improving wastewater treatment and sludge management in line with national and EU standards. The project is financed through a sovereign-guaranteed loan from the European Bank for Reconstruction and Development (EBRD) and co-financed by the Zhambyl region.

Current Status:

Passed Final Review, Pending Approval by EBRD Board.

Start Date:

-

End Date:

Approximately December 2028

Investment Volume (in mln USD):

Approximately USD 76.2 million (KZT 41.3 billion)

Location: Taraz, Zhambyl Region, Kazakhstan

Involved Companies:

1. SCE "Zhambyl Su"

Role: Project Owner and Implementing Agency

Address: Kazybek Bi Street 136, Taraz, Kazakhstan, 080000

Phone: +7 (7262) 45-35-37

Email: taraz-su@mail.ru

2. HYDROPHIL GmbH

Role: Consultant for Project Implementation Unit (PIU) support, procurement, and contract finalization

Address: Kürchnergasse 2, apt. 2aA-1210 Vienna, Austria

Phone: +43 1 996 98 00

3. European Bank for Reconstruction and Development (EBRD)

Role: Primary Financier

Address: Almaty office,41 Kazybek Bi street,"Park Palace" Business Center,3rd entrance, 3rd Floor,050010 Almaty,Kazakhstan Astana office,BC “Talan Towers Offices”23rd Floor,16 Dostyk street,Yesil district,Astana,Kazakhstaт

Phone: +7 727 332 00 00 / +7 7172 554246

Email: EbrdAstanaInfo@ebrd.com

4. CECT Consulting

Role: Feasibility Study Consultant

Address: SEST Engineering LLP, Almaty, Kazakhstan050013, Almaty, Bukhar-Zhyrau Blvd.Bukhar-Zhyrau, 26/1, office No. 25

Phone: +7 727 338 40 38

Email: Kazakhstan@cect.eu

5. ATMS Solutions LLC

Role: Environmental and Social Impact Assessment (ESIA) Consultant

Address: 1, 11 Griboyedov Street, Yerevan 0051, Armenia

Phone: +374 99 109 495

Key People and Contact Details:

1. HYDROPHIL GmbH

Name: Bastian Schnabel

Position: Project Manager

2. CECT Consulting

Name: Valeriy Golubchenko

Position: Senior Procurement Officer, Project Manager

3. ATMS Solutions LLC

Name: Artak Ter-Torosyan

Position: Founder and Environmental & Social Projects Coordinator

Other Important Details:

• Environmental Category: A (requiring a comprehensive Environmental and Social Impact Assessment)

• Co-Financing: KZT 8.5 billion (approximately EUR 16 million) from the Zhambyl region for additional works including recultivation of wastewater lagoons and reconstruction of pumping stations.

• Project Objectives: To improve wastewater treatment and sludge management, reduce greenhouse gas emissions and odors, ensure compliance with local and EU standards, and enable the reuse of treated wastewater for irrigation

Sources:

Photo Sources:

Comments


bottom of page