Bakhty–Ayagoz Railway Line
- aykaowlyagulyyewa
- 3 days ago
- 2 min read
Project Description:
The Bakhty–Ayagoz railway line is a 272-kilometer double-track rail project connecting Ayagoz in eastern Kazakhstan to Bakhty on the Chinese border. This infrastructure aims to enhance freight capacity between Kazakhstan and China, increasing throughput from 28 million to approximately 48 million tons annually. The project is part of Kazakhstan's broader strategy to bolster its transit and transportation capabilities, aligning with the Belt and Road Initiative.
Current Status:
The project is being implemented under a public-private partnership model, with Global Trans as the main private investor.

Start Date: December 2023
End Date: 2027
Investment Volume (in mln USD):
Approximately $1.2 billion (577.5 billion ₸)
Location:
Abai Region, Kazakhstan
Involved Companies:
1. Global Trans Company
Role: Main investor and builder under a Public-Private Partnership (PPP) model
Legal Address:Prospekt Mangilik El, Building 33/2, Apt. 2,Yessil District, Astana, Kazakhstan
Phone: +7 (708) 164-57-33
Phone: +7 (701) 064-00-17
Email: Not publicly available
Website: Not publicly available
Business Identification Number (BIN): 210640017732
Director: Indira Sergeyevna Kozhina
2. China Railway Construction Corporation (CRCC)
Role: Contractor responsible for construction work.
Address: NO.40 Fuxing Road,beijing
Phone: 86-010-52687800
3. Ministry of Infrastructure and Transport of Kazakhstan
Role: Government partner, regulator, and project supervisor. Address: 32/1 Kabanbay Batyr Avenue, Transport Tower, Yessil District, Astana, 010000, Republic of Kazakhstan
Chancellery: +7 (7172) 98-31-35, 98-33-07, 98-33-33, 98-33-08, 98-33-09
Press Secretary: +7 (7172) 98-33-97, 98-33-52, 98-33-54, 98-33-51, 98-33-50
Email: miid@miid.gov.kz
Press Office Email: 241704@bk.ru
Official Website: www.gov.kz
4. Kazakhstan Temir Zholy (KTZ)
Role: Operator of Kazakhstan’s railway network, project designer, and operator of stations and tracks.
Address: 010000, Republic of Kazakhstan, Astana city, Konaev street, 6
Phone: +7 (7172) 60 42 29 / +7 (7172) 60 42 43
Web: railways.kz/en/
5. Subcontractors and Local Construction Companies
• Role: Construction of infrastructure on-site (bridges, overpasses, stations).
• Description: Local companies participate in construction and installation work, ensuring a high share of local content in the project (at least 85%).
Key People and Contact Details:
China Railway Construction Corporation (CRCC)
Name: Moidin Salman Lathif
Position: Procurement Engineer
Other Important Details:
The Bakhty–Ayagoz railway line is expected to alleviate congestion at existing border crossings, such as Druzhba and Korgas, thereby facilitating smoother transit and attracting additional freight volumes. The project also includes the development of a new border crossing at Bakhty–Chuguchak, enhancing connectivity between Kazakhstan and China.
Sources:
Prime Minister of the Republic of Kazakhstan – Construction of New Railroad to China
Ministry of Transport of the Republic of Kazakhstan – Official Website
Karaganda Region Official Portal – Launch of Largest Railway Project
Atyrau Region Official Portal – Development of Transport and Transit Potential
Photo Sources:
Comments